I am using two alternative models to simulate the quarry site:

1. I am planning to use high K value for the bottom layer instead of drain package to simulate the groundwater discharge to the quarry site ( at the bottom). However there is a contrast in K value (8640 m/day to 5 m/day). What K value do I need to put as an additional layer in between, to get rid of non-convergence problem. I presume even the average value of the two K (4320 m/day is much higher comparing with overlying aquifers)?

2. Is there any previous work or example for simulating pre-quarrying, quarrying and post-quarrying time? Basically post-quarrying refers to landfill and there will be no loss of evaporation from the quarry site.

regards

Yohannes

Australia

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

×
×
  • Create New...