Jump to content
GMS, SMS, and WMS User Forum

Stress periods vs. RCH Rate: Time Discrepancy


StefanD
 Share

Recommended Posts

Hi there,

while setting up a groundwater model i noticed the following differences between the display of date and time. The time unit is set to seconds.

The values in the stress periods windows are entered manually and represent the desired time steps, after i added the recharge to the model the RCH Rate windows shows somehow messed up time steps. If I deactive the Show dates/time tick in the RCh rate windows it shows me values like 0,365 ... etc., 365 seconds result in +/- 6:08 minutes which is shown but actually the time steps should cover 1 year, so 365 days should result in 1 year.

post-45215-0-08273700-1430833323_thumb.p

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

×
×
  • Create New...