Mark Bentley Posted June 30, 2011 Report Share Posted June 30, 2011 Is there a way to vertical hydraulic conductivity values using fixed head differences between two boreholes at the same Horizontal location? For example, if I drill two boreholes just a few feet apart but at different depths there is a good chance that the heads could be different. I want to calibrate my vertical hydraulic conductivity so that there is a few feet head difference between the boreholes. Any suggestions for how to proceed? 1 Quote Link to comment Share on other sites More sharing options...
Alan Lemon Posted July 8, 2011 Report Share Posted July 8, 2011 You can create 2 different observation points with the respective heads and then make VK or VANI a parameter that PEST can estimate. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.