Jump to content
GMS, SMS, and WMS User Forum

Search the Community

Showing results for tags 'layer range'.

The search index is currently processing. Current results may not be complete.
  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • News
    • Forum Feedback
  • Arc Hydro Groundwater
    • Using AHGW
  • GMS
    • Using GMS
    • GMS Feature Requests
    • MODFLOW
  • SMS
    • Using SMS
    • Hydraulic Models
    • Wave Modeling
    • Other Models
    • SMS News
    • FHWA - SMS User
  • WMS
    • Using WMS
    • General Hydrology
    • Urban Hydrology
    • Hydraulics and Floodplain Modeling
    • WMS Feature Requests
    • FHWA - WMS User

Calendars

There are no results to display.


Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


AIM


MSN


Website URL


ICQ


Yahoo


Jabber


Skype


Location


Interests

Found 1 result

  1. Hi, I have a MODFLOW/SEAWAT with 12 layers. There are pumping wells in the model that runs through multiple layers (the screens go through multiple layers). Please see how I included the well information in the conceptual model. These wells are supposed to be screen through layer 6 through 8 and each pump is supposed to extract 757 m3/day as you can see. I saved the model in the native text format also in the model set up so that I can also run the model in the command prompt. When I look through the .wel file I noticed the pumping rates are assigned in the following way in the grid cells. It looks like each layer at a given pumping location (grid cells with same i and j) are assigned with the pumping rate provided in the conceptual model. If that is the case, each pumping well is pumping three times the rate that was assigned in the conceptual model. When I assigned the pumping rate in the conceptual model, I was imagining that this 757.6 rate will be divided among the three layers. Please let me know if I have assigned the pumping rates correctly in the conceptual model? Thank you, Lalith
×
×
  • Create New...