Hi there, while setting up a groundwater model i noticed the following differences between the display of date and time. The time unit is set to seconds. The values in the stress periods windows are entered manually and represent the desired time steps, after i added the recharge to the model the RCH Rate windows shows somehow messed up time steps. If I deactive the Show dates/time tick in the RCh rate windows it shows me values like 0,365 ... etc., 365 seconds result in +/- 6:08 minutes which is shown but actually the time steps should cover 1 year, so 365 days should result in 1 year.