Jump to content
GMS, SMS, and WMS User Forum

Search the Community

Showing results for tags 'swi'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • News
    • Forum Feedback
  • Arc Hydro Groundwater
    • Using AHGW
  • GMS
    • Using GMS
    • GMS Feature Requests
    • MODFLOW
  • SMS
    • Using SMS
    • Hydraulic Models
    • Wave Modeling
    • Other Models
    • SMS News
    • FHWA - SMS User
  • WMS
    • Using WMS
    • General Hydrology
    • Urban Hydrology
    • Hydraulics and Floodplain Modeling
    • WMS Feature Requests
    • FHWA - WMS User

Calendars

There are no results to display.


Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


AIM


MSN


Website URL


ICQ


Yahoo


Jabber


Skype


Location


Interests

Found 1 result

  1. Hi, I made a model with solids and materials in GMS and then I used HUF package to define uniform model layers (cells with same thickness in Z directions). in eahc layer I have about 62500 cells (50 by 50 meter each). now I want to add salt into model and run 2 simulation one with 200 year and one with 150 years. MT3DMS run in each takes about 1.5 hour for each one. for SEAWAT I set transport time step to 365 days (one year) but it changes to one day and it takes for ever to be finished! (it does not even give me how long would it take for the model to reach the resul
×
×
  • Create New...