Jump to content
GMS, SMS, and WMS User Forum

Search the Community

Showing results for tags 'trench'.



More search options

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • News
    • Forum Feedback
  • Arc Hydro Groundwater
    • Using AHGW
  • GMS
    • Using GMS
    • GMS Feature Requests
    • MODFLOW
  • SMS
    • Using SMS
    • Hydraulic Models
    • Wave Modeling
    • Other Models
    • SMS News
    • FHWA - SMS User
  • WMS
    • Using WMS
    • General Hydrology
    • Urban Hydrology
    • Hydraulics and Floodplain Modeling
    • WMS Feature Requests
    • FHWA - WMS User

Calendars

There are no results to display.


Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


AIM


MSN


Website URL


ICQ


Yahoo


Jabber


Skype


Location


Interests

Found 1 result

  1. Hi everyone, Can any of you help me with the following question please? I am a beginner of GMS modelling. I want to set up a transient modflow of trench pump testing, however I don't know how to conceptualize the trench. The trench is 100m long, 2m wide, 1m deep, with 7 observation bores locating around the trench. The water levels of trench and bores were logged for 5 hours with pumping rate 1000L/min, and I need to set up a modflow and calibrate the model. The Drain (DRN) package seems not suitable for conceptualizing the trench as the water level of trenching decreasing with time. So can I set up the trench as 5 wells with the pumping rate 200L/min each, or any other suggestions how to deal with the trench please? Thank you for any advice/suggestions in advance. Best regards, Lucy
×
×
  • Create New...