Jump to content
GMS, SMS, and WMS User Forum

Search the Community

Showing results for tags 'pumping data'.



More search options

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • News
    • Forum Feedback
  • Arc Hydro Groundwater
    • Using AHGW
  • GMS
    • Using GMS
    • GMS Feature Requests
    • MODFLOW
  • SMS
    • Using SMS
    • Hydraulic Models
    • Wave Modeling
    • Other Models
    • SMS News
    • FHWA - SMS User
  • WMS
    • Using WMS
    • General Hydrology
    • Urban Hydrology
    • Hydraulics and Floodplain Modeling
    • WMS Feature Requests
    • FHWA - WMS User

Calendars

There are no results to display.


Found 1 result

  1. Hi, I would like to see a functionality in GMS, that would make working with pumping data more easy. Let me make an example to explain what I mean. Consider we would like to import pumping schedule for a single well into a transient model with three periods with a length of 30 days each. The well Q for first period was -100, for second the well was off and for third it was -200. The pumping schedule extracted from a database has this format: well_name time Q well1 1 -100 well1 61 -200 I would like GMS to ask me during import, how do I want to treat the stress periods without any pumping data, in this case the second period. I would like to have an option to choose, that when there are no data for a given period GMS would add 0 for that period automaticaly, e. g. the well is off for that period. This would be realy useful, because otherwise one easily forgets to add the zeroes manualy and ends up with incorrect schedule.
×